Abstract
A reverse startup procedure for a multi terminal smart transformer (MTST) supplying data centres, transitioning from islanded operation to grid connected operation is proposed in this paper. During islanded operation, the MTST low voltage (LV) converter remains active, while the MTST multi active bridge (MAB) converter is partially active and MTST medium voltage (MV) converter is inactive. To facilitate reconnection to the MV grid from the LV side, these converters need to be activated to allow the power flow. In this operation, the power is drawn from a battery energy storage system (BESS) connected to LVdc-1 bus to charge the MTST MVdc bus. Once the MVdc bus is sufficiently charged, the MTST-MV converter is initiated to establish the connection between the LV side and the MV grid. Simulation is performed in PSCAD and the results are provided to validate the effectiveness of this startup operation.
| Original language | English |
|---|---|
| Title of host publication | 2025 IEEE Guwahati Subsection Conference, GCON 2025 |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| ISBN (Electronic) | 9798331513450 |
| DOIs | |
| Publication status | Published - 2025 |
| Event | 2025 IEEE Guwahati Subsection Conference, GCON 2025 - Itanagar, India Duration: 18-06-2025 → 20-06-2025 |
Publication series
| Name | 2025 IEEE Guwahati Subsection Conference, GCON 2025 |
|---|
Conference
| Conference | 2025 IEEE Guwahati Subsection Conference, GCON 2025 |
|---|---|
| Country/Territory | India |
| City | Itanagar |
| Period | 18-06-25 → 20-06-25 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
All Science Journal Classification (ASJC) codes
- Computer Networks and Communications
- Computer Vision and Pattern Recognition
- Signal Processing
- Information Systems and Management
- Energy Engineering and Power Technology
- Renewable Energy, Sustainability and the Environment
Fingerprint
Dive into the research topics of 'Reverse Startup Procedure for Multi Terminal Smart Transformer Supplying Data Centres'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver