TY - GEN
T1 - Total productive maintenance of a diesel power generating unit of a institution campus
AU - Shetty, Pradeep Kumar
AU - Rodrigues, L. Lewlyn R.
PY - 2010/11/29
Y1 - 2010/11/29
N2 - Total Productive Maintenance (TPM) provides a comprehensive, life cycle approach, to equipment management that minimizes equipment failures, production defects and accidents. It involves everyone in the organization from top level management to production mechanics and production support groups to outside suppliers. The objective is to continuously improve the availability and prevent the degradation of equipment to achieve maximum effectiveness. These objectives require strong management support as well as continuous use of work teams and small group activities to achieve incremental improvements. TPM is not a radically new idea; it is simply the next step in the evolution of good maintenance practices. The case study was carried out to check for the Overall Equipment Efficiency (OEE) of Different diesel generator-sets in the one of the Institutions Power Houses. On the basis of collected data and we calculated OEE of the four power house. We find out Availability, Performance efficiency, Quality rate. By using this data we calculated OEE of the four power house and compared. a) In Power House 1 - Generator 1 has an OEE of 85.12%, Generator 2 has an OEE of 84.61 %, Generator 3 has an OEE of 84.44%, and Generator 4 has an OEE of 84.73%, b) In Power House 2 - Generator 1 has an OEE of 87.25%, Generator 2 has an OEE of 87.31 %, c) Power House 3- Generator has an OEE of 88.63%, d) Power House 4 - Generator has an OEE of 85.06 %, we have to achieve 90% OEE.
AB - Total Productive Maintenance (TPM) provides a comprehensive, life cycle approach, to equipment management that minimizes equipment failures, production defects and accidents. It involves everyone in the organization from top level management to production mechanics and production support groups to outside suppliers. The objective is to continuously improve the availability and prevent the degradation of equipment to achieve maximum effectiveness. These objectives require strong management support as well as continuous use of work teams and small group activities to achieve incremental improvements. TPM is not a radically new idea; it is simply the next step in the evolution of good maintenance practices. The case study was carried out to check for the Overall Equipment Efficiency (OEE) of Different diesel generator-sets in the one of the Institutions Power Houses. On the basis of collected data and we calculated OEE of the four power house. We find out Availability, Performance efficiency, Quality rate. By using this data we calculated OEE of the four power house and compared. a) In Power House 1 - Generator 1 has an OEE of 85.12%, Generator 2 has an OEE of 84.61 %, Generator 3 has an OEE of 84.44%, and Generator 4 has an OEE of 84.73%, b) In Power House 2 - Generator 1 has an OEE of 87.25%, Generator 2 has an OEE of 87.31 %, c) Power House 3- Generator has an OEE of 88.63%, d) Power House 4 - Generator has an OEE of 85.06 %, we have to achieve 90% OEE.
UR - http://www.scopus.com/inward/record.url?scp=78649294848&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=78649294848&partnerID=8YFLogxK
U2 - 10.1109/ICMET.2010.5598493
DO - 10.1109/ICMET.2010.5598493
M3 - Conference contribution
AN - SCOPUS:78649294848
SN - 9781424481019
T3 - ICMET 2010 - 2010 International Conference on Mechanical and Electrical Technology, Proceedings
SP - 68
EP - 71
BT - ICMET 2010 - 2010 International Conference on Mechanical and Electrical Technology, Proceedings
T2 - 2010 International Conference on Mechanical and Electrical Technology, ICMET 2010
Y2 - 10 September 2010 through 12 September 2010
ER -